Enterprise Electric Company

BWI Airport International Pier Extension

BWI Airport International Pier Extension

BWI Airport, Maryland 21240

Description

This project extended the existing International Pier with three new terminal levels: Arrival, Sterile, and Departure levels. The extension included six new gates for holdrooms and passenger boarding bridges. The new skylight with LED color changing accent lights is the focal point of this extension.

Scope of Work

Subcontractor. In an active airport, Enterprise Electric intercepted the existing North & South MV Feeders feeding Substation E2. Extended MV cables from the new manhole to new Substation E3. Installed new lighting control panels, power panels, and metering. Installed LED lighting through-out the terminal, including the LED color changing system for the skylight. Installed new High Mast lighting, 250 kw Emergency Generator, 3 Transfer Switches, 40 kva UPS system, and a 4000A Docking Station. Installed new Fire Alarm System, Flight Informational Display Monitors, Security System, Emergency Paging System, Lightning Protection, and Charging Stations in holdrooms.  

Overall Project Size: 70,000 SF